Case Studies

Real challenges. Real solutions.

A closer look at selected projects — the challenges on site, the approach taken, the work delivered and the outcome.

Industrial Construction

Building through difficult terrain.

An industrial construction project for Japfa Comfeed executed in a remote village environment with difficult ground conditions, limited material availability and local site challenges.

Category Industrial Construction
Client Japfa Comfeed
Location Remote village area
Scope Civil & Industrial Works

The site itself was part of the challenge.

The project was located in a remote village area where construction had to be carried out under difficult site conditions.

The ground presented black cotton soil and a high groundwater level .

The team also had to deal with scarcity of construction materials and local site-related issues.

Japfa Comfeed industrial construction site

Adapt the execution to the ground.

Instead of treating the site limitations as isolated problems, the construction approach had to account for the terrain, groundwater and availability of materials.

The work was planned around the actual conditions encountered at the remote project location.

Japfa construction solution

Multiple works. One coordinated delivery.

The completed scope included construction of a precast compound wall , painting works covering 50,000 sq. ft., construction of RCC tanks and internal works for the industrial shed.

Japfa industrial shed construction

Industrial works delivered despite challenging site conditions.

50,000 Sq. ft. painting works
RCC Tank construction & Compound wall of 2KM
01 Integrated industrial scope
Industrial Interior & Turnkey

Building inside a live factory.

A turnkey Smart Control Tower project for LG Electronics Pvt. Ltd., executed on an operating shop floor while coordinating continuously with the production team.

Category Turnkey Industrial Project
Client LG Electronics Pvt. Ltd.
Working Environment Live Shop Floor
Scope Turnkey

Construction without stopping production.

The project was executed directly on a working shop floor .

This required close coordination with the production team while working within a stringent project timeline.

At the same time, the project had to maintain industrial safety requirements.

One team. One turnkey scope.

Thakar Associates approached the project as a complete turnkey delivery rather than treating each component independently.

The scope brought together electrical works, furniture, interiors, fabrication and façade work under one coordinated execution.

Four control towers. Two buildings.

The project resulted in four Smart Control Towers constructed across two buildings .

Execution was carried out with the production team and with industrial safety norms taken into consideration.

A complete turnkey delivery within a live industrial environment.

04 Smart Control Towers
02 Buildings
01 Turnkey delivery
CSR Infrastructure

Construction that reaches communities.

A long-running CSR construction journey for Fiat India Automobiles Pvt. Ltd., progressing from school sanitation infrastructure to water conservation, village development and school construction.

Category CSR Activity
Client Fiat India Automobiles Pvt. Ltd.
Timeline 2015 – 2025
Coverage Multiple rural locations

One CSR relationship. Many community needs.

2015–2019

School Toilet Blocks

ZP schools across Shirur, with five models based on student strength.

2020–21

Temporary Hutments

Construction at Ghutake village in Mulshi.

2021–22

Water Conservation

Water conservation activity and CNB construction.

2022–23

Modern Village

Construction work supporting modern village development.

2023–24

Ambegaon CSR Work

Ambegaon selected for continued CSR work.

2024–25

School Building

Construction of a school building in Taluka Velhe.

Infrastructure needs were spread across communities.

The first phase involved construction across 100+ scattered locations in remote villages.

Five different toilet-block models were required depending on the strength of students in each school.

FIAPL CSR school infrastructure

A phased programme that evolved with the need.

The CSR work progressed through different infrastructure requirements instead of remaining limited to a single type of construction.

The programme expanded into temporary hutments, water conservation, CNB construction, modern village work and school infrastructure.

FIAPL CSR activity

From sanitation to broader community infrastructure.

The documented CSR programme included school toilet blocks, school refurbishment, toilet refurbishment, Mahila Shakti Kendras, Aanganwadi construction and refurbishment, CNB dams, nallah desilting, rainwater harvesting and concrete roads.

The first documented phase alone covered approximately 4,000 sq. metres of construction area and benefited approximately 30,000 students .

FIAPL CSR construction

A construction programme measured in communities reached.

100+ Scattered locations
4,000 Sq. metres constructed
30,000 Students benefited